Before loading and leaving the dock, the purpose of freight reduction is to be realized.
The current trend in Labor costs continues to rise. This year, us Labor costs hit record Numbers, the biggest gain in more than five years.
Stretching packaging needs to be considered, especially those that already involve manual packaging loads. We all know that this process is a time-consuming process. The operator sometimes has to do the same thing on the forklift truck.
In fact, when you’re using a wrapper that has an extended wrapper that improves productivity, it’s actually ok to avoid these tedious steps.
Here, we have three experts who have given hints, and with little effort, you can achieve the goal of reducing costs:
A dynamic pretensioning membrane conveying system has been invested in stretching packaging. This influential productivity boost can reduce movie costs substantially, and by experience, it is generally reduced by at least 50%. The process of extending the membrane is pre-stretching, and the membrane production can be improved. When two rollers rotate at two different speeds in the movie delivery system, the film stretches. If it’s a regular customer, he can save at least $25,000 in five years. You can use simple automation to achieve the goal of eliminating the labor force, which is a technology that has been saved at least $50,000 in the first five years. At this point, your operator still starts the machine with the remote control on the forklift. It is also ok to perform another task, and when the load ends and the loop completes, it is ok to select it. What needs to be done in packaging is weighing. Buying new stretched packaging with a built-in size is one option, and another option is to use existing wrappers on the platform. When weighing and packaging are being done at the same time, it is ok to double the load from 30 seconds to 1.5 minutes from one stretch wrapper to one platform scale. In 10 years, this will make the labor force much smaller, and in general it can reduce the labor force by $15,000 to $30,000. Also, when each load is weighed against you, the risk of paying an expensive no more than a truckload (LTL) is reduced.
Eliminating unnecessary steps can actually reduce labor, and your money will be saved – saving thousands of dollars in just a few years.